Owner – USACE Savannah District

GC – Walbridge Detroit MI

Year 2008-2011

 

-         Fort Stewart, GA

-         2nd Brigade Combat Team (Value $373,800.00)

-          PROJECT AT MULTIPLE LOCATIONS ON FORT STEWART

§  Temporary Facility (Approximately 4 Acre Site)

·         Finish Grade

·         Sod and Hydro-Seed

·         Establish Grassing

§  Classroom Facility (Approximately 2 Acre Site)

·         Place Topsoil

·         Finish Grade

·         Sod and Hydro-Seed

·         Establish Grassing

·         Place Concrete Light Pole Bases

·         Install Concrete Cased Electrical Conduit for Exterior Lighting

·         Construct 1500sy Asphalt Parking Lot

·         Parking Lot Signage and Stripping

§  Battalion Head Quarters (HQ) Building (Approximately 2 Acre Site)

·         Place Topsoil

·         Finish Grade

·         Sod and Hydro-Seed

·         Establish Grassing

·         Place Concrete Light Pole Bases

·         Install Concrete Cased Electrical Conduit for Exterior Lighting

·         Construct 2300sy Asphalt Parking Lot

·         Parking Lot Signage and Stripping

·         Repair Asphalt Penetrations in Adjacent Parking Lot

·         Place WWF for Second Story Concrete Pour

·         Place and Finish Concrete for Interior Stair Pans and Landings

·         Clean “Red-Iron” Structure After Placement

§  Brigade Head Quarters (HQ) Building (Approximately 2 Acre Site)

·         Place Topsoil

·         Finish Grade

·         Sod and Hydro-Seed

·         Establish Grassing

·         Construct 3000sy Asphalt Parking Lot

·         Parking Lot Signage and Stripping

§  Maintenance Parking Lot 1 (Approximately 4 Acre Site)

·         Finish Grade

·         Hydro-Seed and Establish

·         Install 117 – 8” Bollards and Finish

§  Maintenance Parking Lot 2 (Approximately 4 Acre Site)

·         Finish Grade

·         Hydro-Seed and Establish

 

-         3rd Infantry Division (Value $14,500.00)

§  I.D. Card Facility (Approximately 1 Acre Site)

·         Construction Barrier Fencing

·         Grind and Level Floors (Select Rooms) for VCT Installation

·         Finish Grade

·         Sod and Hydro-Seed

·         Establish Grassing

 

-         Combat Medical Team (Value $127,571.00)

§  T.E.M.F. Tactical Equipment Maintenance Facility (Approximately 10 Acre Site)

·         Remove and Stage 10 Acres of Pre-Fell trees for Logging Contractor due to Swamp Conditions

·         Grade, Place Fabric, and Stone For “Clear Zone Fencing”

·         Excavate Unsuitable Soils for Parking Lot

·         Install w/Tensar Gravel Parking Lot 100’X30’

·         Final Grade

·         Sod and Hydro-Seed

·         Establish Grassing

·         Stabilize Front Drive 1100’X60’

·         Install and Finish 20 12” Bollards

 

-          4th Brigade Combat Team (Value $2,129,626.00)

§  Infrastructure (Approximately 550 Acres)

·         Screen and Place 25,000cy topsoil

·         Final Grade 100 Acres

·         Amend Soils to Meet Specifications

·         Install 2330 Trees

·         Install 7566 Shrubs

·         Back Fill and Shape all Islands in Parking Lots

·         Hydro-Seed 100 Acres and Establish

·         Install Slope Drains for Detention Ponds

·         Install 410,000sf Sod in Drainage Swales and Establish

 

-         Hunter Army Air Field HAAF

-         75th Ranger Battalion (Value $57,166.00)

§  Equipment Maintenance Facility

·         Place Topsoil

·         Final Grade

·         Sod and Hydro-Seed

·         Plantings

·         Establish Grass and Plants

§  Company Operations Facility

·         Place Topsoil

·         Final Grade

·         Sod and Hydro-Seed

·         Establish Grassing

-           

 

-           

 