Blankenship Civil Construction
Certified SDVOSB
Owner – USACE Savannah District
GC – Walbridge Detroit MI
Year 2008-2011
-
Fort Stewart, GA
-
2nd Brigade Combat Team (Value $373,800.00)
-
PROJECT AT MULTIPLE LOCATIONS ON FORT
STEWART
§ Temporary Facility (Approximately 4
Acre Site)
· Finish Grade
· Sod and Hydro-Seed
· Establish Grassing
§ Classroom Facility (Approximately 2
Acre Site)
· Place Topsoil
· Finish Grade
· Sod and Hydro-Seed
· Establish Grassing
· Place Concrete Light Pole Bases
· Install Concrete Cased Electrical Conduit for Exterior Lighting
· Construct 1500sy Asphalt Parking Lot
· Parking Lot Signage and Stripping
§ Battalion Head Quarters (HQ) Building
(Approximately 2 Acre Site)
· Place Topsoil
· Finish Grade
· Sod and Hydro-Seed
· Establish Grassing
· Place Concrete Light Pole Bases
· Install Concrete Cased Electrical Conduit for Exterior Lighting
· Construct 2300sy Asphalt Parking Lot
· Parking Lot Signage and Stripping
· Repair Asphalt Penetrations in Adjacent Parking Lot
· Place WWF for Second Story Concrete Pour
· Place and Finish Concrete for Interior Stair Pans and Landings
· Clean “Red-Iron” Structure After Placement
§ Brigade Head Quarters (HQ) Building
(Approximately 2 Acre Site)
· Place Topsoil
· Finish Grade
· Sod and Hydro-Seed
· Establish Grassing
· Construct 3000sy Asphalt Parking Lot
· Parking Lot Signage and Stripping
§ Maintenance Parking Lot 1 (Approximately
4 Acre Site)
· Finish Grade
· Hydro-Seed and Establish
· Install 117 – 8” Bollards and Finish
§ Maintenance Parking Lot 2
(Approximately 4 Acre Site)
· Finish Grade
· Hydro-Seed and Establish
-
3rd Infantry Division (Value $14,500.00)
§ I.D. Card Facility (Approximately 1
Acre Site)
· Construction Barrier Fencing
· Grind and Level Floors (Select Rooms) for VCT Installation
· Finish Grade
· Sod and Hydro-Seed
· Establish Grassing
-
Combat Medical Team (Value $127,571.00)
§ T.E.M.F. Tactical Equipment
Maintenance Facility (Approximately 10 Acre Site)
·
Remove and Stage 10 Acres of Pre-Fell trees for
Logging Contractor due to Swamp Conditions
·
Grade, Place Fabric, and Stone For “Clear Zone
Fencing”
·
Excavate Unsuitable Soils for Parking Lot
·
Install w/Tensar
Gravel Parking Lot 100’X30’
·
Final Grade
·
Sod and Hydro-Seed
·
Establish Grassing
·
Stabilize Front Drive 1100’X60’
·
Install and Finish 20 12” Bollards
-
4th Brigade Combat Team
(Value $2,129,626.00)
§ Infrastructure (Approximately 550
Acres)
·
Screen
and Place 25,000cy topsoil
·
Final
Grade 100 Acres
·
Amend
Soils to Meet Specifications
·
Install
2330 Trees
·
Install
7566 Shrubs
·
Back
Fill and Shape all Islands in Parking Lots
·
Hydro-Seed
100 Acres and Establish
·
Install
Slope Drains for Detention Ponds
·
Install
410,000sf Sod in Drainage Swales and Establish
-
Hunter Army Air Field HAAF
-
75th Ranger Battalion (Value $57,166.00)
§ Equipment Maintenance Facility
·
Place
Topsoil
·
Final
Grade
·
Sod
and Hydro-Seed
·
Plantings
·
Establish
Grass and Plants
§ Company Operations Facility
·
Place
Topsoil
·
Final
Grade
·
Sod
and Hydro-Seed
·
Establish
Grassing
-
-